Princeton, NJ - Global Wrap Temporary Construction Walls and Opening Enclosures
- Global Wrap®
- Jun 11, 2021
- 1 min read
Updated: Mar 26
Global Wrap worked with the client on a multi mobilization project involving taking down the Global Wrap temporary opening enclosures from over fifty openings and then reinstalling them after the contractor installed their materials on the side walls of each opening. Time was of the essence and what was projected to take three weeks was done less than two weeks.
Comentários