Global Wrap® Designed and Installed a Dust Containment System to Protect a Manufacturing Plant

April 4, 2018

Project Size : 25,000 sq.ft.

Project Duration : 2 Weeks

Location : Morgantown, PA

 

Job Challenge

Global Wrap® was called into a manufacturing facility that was going robotics for the assembly of the product. In order to do this, the existing concrete deck had to be removed to pour a thicker deck to accommodate the robotic equipment needed. The retrofit called for 25,000 sq. ft. of concrete to be broken up and disposed of, without any of the dust leaking out into the rest of the plant. Production continued outside the containment, saving the client many thousands of dollars.

 

The Solution

Global Wrap® met with the client and designed a Class 1 Environmental Containment - Dust Containment System to meet the challenge. The Global Wrap® Dust Containment Systems©was irregularly shaped and high enough to allow the crew and equipment the working space to work within. Using 7 mil, fire retardant reinforced film and cabling, this project was completed in two days to meet the client’s needs and scheduling. Over its 38 year history, Global Wrap® has met the challenge to design and install Class 1 containments for many markets including industrial, airports, chemical plants, medical facilities and others. 

 

 

 

 

Share on Facebook
Please reload

CONTACT US

FOLLOW
  • LinkedIn Social Icon
  • Facebook Social Icon
  • YouTube Social  Icon
  • Instagram Social Icon

Sign-up for our newsletter and get the latest from Global Wrap® !

FL Office

3530 Agricultural Center Dr #206,

St. Augustine, FL 32092

Canada Office

32 Walden Mount SE

Calgary, AB T2X 0Z9

Copyright © 2019 by Global Wrap®. All Rights Reserved.