top of page
MGM Washington DC_edited.jpg

The Original Shrink Wrap Company

WE INVENTED THE PROCESS SINCE 1980

Temporary Suspended Ceilings

Breakaway System

Dust Containment System

Temporary Dust Barrier Walls

shrink wrap roof, temporary walls

Shrink Wrap Roof Decks

Temporary Curtain Walls - FleX Walls

Temporary Buildings

Quick Shelters

Safety, Quality, Sustainability and On Schedule 

temporary curtain wall, shrink wrap construction, weather protection, shrink wrap opening

Temporary Curtain Walls - FleX Walls©

University

Princeton, NJ

Project Size: 50 Openings     

Project Duration: 1.5 Weeks

Global Wrap® worked with the client on a multi mobilization project, involving taking down the Global Wrap temporary opening enclosures from over fifty openings and then reinstalling them after the contractor installed their materials on the side walls of each opening.   

Dust Containment Systems

A Food Plant

Morgantown, PA

Project: Silicone Dust Control  

Project Size: 300’L x 25’H’

Project Duration: 4 Days

We installed the Global Wrap 12 mil, fire retardant shrink film temporary dust barrier wall, 300’L x 25’H’ to underside of roof deck. Secured to floor deck and underside of roof deck with Hilti nails. Heat shrunk all surfaces. 

Learn More

silicone dust control
construction weather protection,shrink wrap scaffodling, environmental containment construction

Shrink Wrap Dome

State capitol building

Project Size: 13,600       

Project Duration: 1 Week

Recently we installed our proprietary  wrap system over the dome of a state capitol building being restored. The sides of the dome tower were tarped with the conventional grommet tarps.  A tornado came through the area tearing the tarps off, however Global Wrap remained tight.

Learn More

bottom of page