| Industrial Environmetal Class 1 Srhink Wrap Containments, Global Wrap®, 31 Years Experience Global Wrap®, |
|
The Titan Crane, Panama
Global Wrap® was contacted by a major industrial steel painter who had heard about us and found us through an engineering company here in the states. Tony and Judith Seraphin flew down to the canal and scoped out the work to be done. It was a daunting task due to the weather conditions, rainy season, high winds and lightning. Safety was extreme, as it should have been being 342' above the water line. The object was to encapsulate the boom for lead abatement and repainting. Global Wrap® had to design a frame work to install the cover. The following images are of this most difficult containment in our 31 Years. Our crew worked with the painting contractors crew to accomplish this feat.
|
 |
| The Tital Crane, Panama Canal |
|
|
 |
| The Titan Floating Crane, Global Wrap Environmental Lead Abatement Class 1 Containment. |
|
|
 |
| The Titan Crane Being Global Wrapped |
|
|
 |
| Global Wrap Technician installing the containment |
|
|
|
|
|
 |
| Mission Accomplished |
|
|
 |
| Judith and Tony Seraphin |
|
| During our trips to the Canal we were taken out into the jungles surrounding the canal. Nothing has changed with the natives there over the last century. They seemed happy and family oriented as well as at peace with their surroundings. Six miles away were high rises and industry, but you wouldn't know it here where the region is protected by the government. The basket I am holding took her over four months to make.
|
Interior Protection – Temporary Enclosures
– Dust and Debris Barriers
High Structure Cleaning – Class 1
Environmental Containments
Shrink Wrap Buildings, Scaffolding, Roofs
|
|